Showing posts with label Tileston-Hollingsworth Dam. Show all posts
Showing posts with label Tileston-Hollingsworth Dam. Show all posts
Friday, February 6, 2009
Tileston-Hollingsworth Dam
I went to the Tileston-Hollingsworth Dam yesterday to see how it looks in winter. I was hoping for more ice on the spillway, but it looks look good anyway.



Monday, November 10, 2008
Tileston-Hollingsworth Dam
I went to the Tileston-Hollingsworth Dam on the Neponset River in Boston today.
A new bill has passed that allocates $11 Million for cleanup of PCBs in the river. This may include removal of the dam and the Baker Dam downstream. If the dams aren't removed, they have about 20 years left in their design life (approximately 70 years).


A new bill has passed that allocates $11 Million for cleanup of PCBs in the river. This may include removal of the dam and the Baker Dam downstream. If the dams aren't removed, they have about 20 years left in their design life (approximately 70 years).
Subscribe to:
Posts (Atom)